Historique des commits

Auteur SHA1 Message Date
  Sven Czarnian dd9e725fc2 fix parts in the runway manager il y a 3 ans
  Sven Czarnian ccb3774872 calculate the maximum TTL il y a 3 ans
  Sven Czarnian 51c963de52 add a maximum time to lose to define some constraints il y a 3 ans
  Sven Czarnian 7c6d098812 increase computational performance il y a 3 ans
  Sven Czarnian d191da2303 store the WTC in the inbound itself il y a 3 ans
  Sven Czarnian 12d77d0e71 increase performance il y a 3 ans
  Sven Czarnian 33b32befbc add a comment for the final changes il y a 3 ans
  Sven Czarnian 1b2003e879 update the constructor il y a 3 ans
  Sven Czarnian 7a1d4a5959 optimize the performance il y a 3 ans
  Sven Czarnian 62f2a6c3ed add TODOs for the later release il y a 3 ans
  Sven Czarnian 01ce0f1bfe measure the execution time il y a 3 ans
  Sven Czarnian 6151fc255a remove useless prints il y a 3 ans
  Sven Czarnian fec26a6d6d call the optimization il y a 3 ans
  Sven Czarnian 061eb7eac6 implement the first version of the ACO algorithm il y a 3 ans
  Sven Czarnian a468f1cc53 fix a VRB-bug il y a 3 ans
  Sven Czarnian 125eef8729 add some additional parameters il y a 3 ans
  Sven Czarnian c09a5ffe77 fix some bugs in the runway manager during the ETA calculation il y a 3 ans
  Sven Czarnian c835944e8d sort the FCFS list il y a 3 ans
  Sven Czarnian 0c97e5aa67 initialize the random number generator il y a 3 ans
  Sven Czarnian 43589eaa35 fix two found crashes il y a 3 ans
  Sven Czarnian a7541925c7 rename the cost function. it manages more the runways il y a 3 ans
  Sven Czarnian 3b8989508e add the absolut minimal optimization value due RHC definition il y a 3 ans
  Sven Czarnian 217c9ad742 rename the member to PlannedArrivalTime for better readability il y a 3 ans
  Sven Czarnian 91b735df2f calculate times for all possible runways -> allows lookup for later optimization il y a 3 ans
  Sven Czarnian 9f6c9f1ff8 do not double optimize the speed until IAF two times il y a 3 ans
  Sven Czarnian 44837e59f1 extend the logger for debugging purposes il y a 3 ans
  Sven Czarnian 5295d1c155 use the theoretical earliest arrival time il y a 3 ans
  Sven Czarnian 9887aa48a4 add more values for later plannings il y a 3 ans
  Sven Czarnian 73e5a42f52 place the recat spacing in the constraints il y a 3 ans
  Sven Czarnian 3313a8d463 calculate the descend profiles based on the arrival constraints il y a 3 ans